OUR PROJECTS

Total Usan FPSO STB 3 Load Out at Nigerdock

ExxonMobil Itut Jacket on Wellmann SPMT before Load Out at Nigerdock

Total Usan FPSO Project

Wellmann Self Propelled Modular Trailer (SPMT) at Wellmann Warehouse

Exxonmobil Twin Topside (Itut & Abang) Load Out at Nigerdock

Transportation Of Total Usan Structure At Nigerdock

Load Out Of the SNEPCO BONGA FPSO Flare Boom

Total Usan Twin Structures Set For Sail Away From Nigerdock

Mobilisation Of wellmann Self Propelled Modular Trailers (SPMT) To Site

Arrival Of Wellmann Offshore Barges The Emuesiri And River Nelson On Piggy Back From China

Wellmann Terex Crane On Site

Brainstorming With Technical Partners Before Load Out

Wellmann Workers At A JSA Meeting Prior To Load Out

Total Usan FPSO Project

Total OWL Module Project

Total Usan FPSO project

Commissioning Of Exxonmobil Abang Topside By President Goodluck Ebele Jonathan At Nigerdock

Dormanlong Pressure Vessel Transportation

Total Usan FPSO project

Wellmann Ballast Crew During Operation

Wellmann Cargo Barge (River Nelson)

Shell Ovhor Concrete Barge Towage from Bonny Island To Shell IA Warri

Chevron DSO Jackets Load Out

DANGOTE FERTILIZER MODULES

DREDGE PONTOO

DSCN2656

DSCN2782

DSO JACKET

DSO LQ DECK

DSO LQ DECK 2

DSO SONAM TOP SIDE

EIFFEL LINK BRIDGE

EIFFEL LIVING QUARTERS

G.E TRANSFORMER

K2S SLUG CATCHER SOKU

OFD 3 TOPSIDE

OFD 3 TOPSIDE 2

OFD 5 TOPSIDE

OKAN PRP TOPSIDE

SOMAN TOPSIDE 2